Parliament seeks Chartered Fire Engineer for heritage restoration project

Fire safety leadership required for complex restoration programme

Job title: Fire Engineer
Salary: Circa £100,000 + benefits
Location: London SW1P 3JA – hybrid working available
Organisation: Parliamentary Restoration and Renewal Programme
Closing date: 12 noon, 18 August 2025

Click here to apply

The Parliamentary Restoration and Renewal Programme is recruiting a Chartered Fire Engineer to lead best-in-class fire safety delivery across a variety of supply chain partners. The role is central to ensuring consistently high standards during design, construction, commissioning and handover activities.

This is a key position within a small team, serving as the technical expert on fire safety and acting as Parliament’s representative when the building is outside of its direct control. The Fire Engineer will also manage supply chain and procurement activity with a focus on technical evaluation.

Candidate profile

Applicants must be Chartered Fire Engineers with extensive field experience. Candidates should have a strong track record in producing and reviewing fire engineering reports, and familiarity with safety case development.

Benefits include

• 30 days holiday plus public holidays
• Discretionary bonus scheme (corporate and individual performance)
• Life assurance of 4x salary (death in service)
• Group Income Protection
• Employer pension contribution up to 10%
• Up to 5 days paid volunteering
• Cycle to work scheme
• Season ticket loan
• Employee Assistance Programme
• Professional body fees paid
• Flexible hybrid working

About the project

This role supports the extensive restoration of the Palace of Westminster, a UNESCO World Heritage Site and one of the world’s most iconic parliamentary buildings. The Palace includes over 1,100 rooms, 100 staircases, and three miles of passageways, and hosts thousands of personnel daily across a range of functions.

The Restoration and Renewal Programme is conducting thousands of hours of surveys and investigations to inform its restoration strategy, which is set to support a broad range of UK industries and preserve vital traditional crafts.

Security clearance

The successful applicant must obtain a minimum Counter Terrorist Check (CTC) level of security clearance via the Parliamentary Security Department. Eligibility may be affected if the applicant has resided outside of the UK for more than two of the past five years.

Job role summary

A new role has been announced for a Chartered Fire Engineer to join the Restoration and Renewal Programme for the Palace of Westminster. The position will lead on fire safety assurance throughout the design, construction, commissioning and handover phases of the work.

The appointed individual will act as Parliament’s key interface for fire safety, particularly when the building is not under direct Parliamentary control. Responsibilities include overseeing supply chain performance, procurement evaluation, and maintaining consistent fire safety standards across all delivery partners.

Applicants must be Chartered Fire Engineers with demonstrable experience in the field. Required skills include the ability to review and produce detailed fire engineering reports and safety cases, as well as liaise effectively with multidisciplinary teams.

The position offers a hybrid working arrangement based in London SW1P, with a salary of circa £100,000 per annum. The benefits package includes 30 days annual leave, up to 10% employer pension contribution, group income protection, and additional allowances such as professional fees and volunteering leave.

The role offers the opportunity to work on one of the UK’s most historic and complex buildings. The Palace of Westminster includes more than 1,000 rooms, 100 staircases and over three miles of passageways. Restoration efforts aim to ensure the site’s preservation while supporting UK supply chains and traditional skills.

The Restoration and Renewal Programme is currently conducting extensive surveys and engaging with industry experts to shape the future of the site. Thousands of people work at the Palace daily, and the programme has already created roles in architecture, engineering and traditional trades.

Applications for the role close at 12 noon on 18 August 2025. All applicants must undergo security vetting to at least Counter Terrorist Check (CTC) level. Residency restrictions may apply for candidates who have lived outside the UK for more than two of the past five years.

Click here to apply

Stantec acquires Cosgroves to boost building engineering in New Zealand

Stantec grows engineering capacity with New Zealand acquisition

Stantec has acquired Christchurch-based Cosgroves, a buildings engineering firm with 90 staff, as reported by Stantec.

The company said the acquisition increases its overall workforce in New Zealand by 10 percent, taking total staff numbers in the country to more than 900.

Cosgroves delivers services across fire, mechanical, electrical, hydraulics, civil and sustainable engineering, with a client base spanning public and private sectors.

Stantec said this acquisition strengthens its capability in buildings engineering across New Zealand, with additional applications in Australia.

The company stated that this expansion supports global business growth areas including healthcare, advanced manufacturing and data centres.

Engineering services targeted at health and infrastructure sectors

According to Stantec, the Cosgroves acquisition is intended to address increasing demand in key public infrastructure sectors, especially healthcare.

The firm said government funding commitments in New Zealand are expected to drive demand for integrated buildings engineering services.

Stantec said the combined team will support projects requiring both local relationships and international delivery experience.

It also said Cosgroves’ experience in sustainability and technical coordination will contribute to its capacity in complex infrastructure builds.

Cosgroves founding director Brady Cosgrove said: “For nearly 30 years, we have been delivering reliable, sustainably focused services, and we now find ourselves facing an exciting opportunity for growth.”

Cosgrove added: “In joining Stantec, we are positioning ourselves to capitalise on increased investments through our local relationships and Stantec’s international experience, while providing our staff with expanded opportunities to work on national and international projects.”

Acquisition aligns with existing regional growth strategy

Stantec has expanded its operations in New Zealand through a series of acquisitions, according to the company.

It previously acquired Cardno, Traffic Design Group and MWH, increasing its reach across transport, water and government sectors.

It said the addition of Cosgroves will further enhance its buildings sector capabilities, both in New Zealand and neighbouring Australia.

Stantec president and chief executive officer Gord Johnston said: “Cosgroves is a highly respected technical firm and bringing them onboard will diversify our offerings and reinforce our position amongst the top-ranked firms in New Zealand.”

Johnston added: “Our two firms have shared values and a history of working together, and our complementary strengths will support our strategic plan in a key region we’ve identified as a core area for growth.”

Australian presence also strengthened through deal

The acquisition also increases Stantec’s engineering presence in Australia.

According to the company, Cosgroves’ expertise complements the work of Wood & Grieve Engineers, which Stantec acquired in 2019.

Combined, the companies now support a regional workforce of over 2,800 engineering professionals across Australia and New Zealand.

Stantec said this enables the group to deliver flexible and scalable engineering solutions across both countries.

The company said cross-regional collaboration will help meet rising demand in the mission critical and health sectors.

Cosgroves projects span health, science and civic buildings

Stantec reported that Cosgroves has delivered buildings engineering services on major projects across New Zealand.

Notable schemes include the Christchurch Town Hall redevelopment, where the firm integrated electrical services into heritage architecture.

Cosgroves also contributed to the Rutherford Regional Science and Innovation Centre, working with Stantec to deliver mechanical, electrical, hydraulic and sustainable systems for the University of Canterbury.

Other projects listed include Invercargill Central, the Manukau Health Park redevelopment and the Canterbury District Health Board Outpatients Building.

Cosgroves also worked on the redevelopment of The Court Theatre in Christchurch, delivering coordinated design and fire engineering services.

Stantec acquires Cosgroves to boost buildings engineering in New Zealand: Summary

Stantec has acquired Cosgroves, a 90-person buildings engineering firm based in Christchurch, New Zealand.

The acquisition increases Stantec’s New Zealand workforce by approximately 10 percent.

Cosgroves delivers fire, mechanical, electrical, hydraulics, sustainability and civil engineering services.

Stantec stated that the acquisition supports growth in healthcare, manufacturing and data centres.

The company said this aligns with its regional strategy and global business priorities.

Cosgroves will also support Stantec’s Australian operations alongside its existing team.

Combined, the Australia and New Zealand workforce will exceed 2,800 employees.

Projects completed by Cosgroves include civic, academic, retail and healthcare buildings.

Stantec has previously acquired Cardno, TDG, MWH and Wood & Grieve Engineers in the region.

Stantec said the acquisition strengthens its engineering capability and local project delivery.

Fire Engineer reportedly ‘completely ignorant’ of Grenfell Cladding Plans

Firefighter, Tony Pearson stated at the inquiry into the fire, that at the time of reviewing the fire strategy for the building’s refurbishment, he ‘had no clue’ that cladding was part of the plans.

The second phase began with a focus on decisions ‘taken in the months and years before the fire’, its immediate aftermath and the government’s role. ‘Key revelations’ included that ‘almost none’ of the clients, consultants or contractors during the refurbishment were ‘accepting much blame’, and ‘ignored pleas from the inquiry not to engage in a “merry-go-round of buck-passing”’.

The first week heard refurbishers ‘knew cladding would fail’; witnesses threatened to ‘withhold evidence’; and a consultant was not sent a key report. However hearings were delayed due to witnesses asking for assurances that ‘anything they say will not be used in criminal prosecutions against them’. This was granted, and the inquiry resumed.

The inquiry also acknowledged that Sir Martin had written to Attorney General Suella Braverman to ‘request an extension’ in late April, and she extended the ruling. After the agreement had been made, testimony from architects Studio E admitted it ‘lacked experience in cladding tower blocks’ and was selected ‘despite never having carried out similar work’, without any ‘competitive procurement process, interview or design competition’.

Later, emails between senior fire engineers and consultants at Exova Warrington Fire saw admissions that refurbishment plans were making ‘a crap condition worse’, and ‘no sprinklers [were] wanted’. Studio E’s lead designer Neil Crawford then alleged that Celotex ‘calculatedly sought to deceive’ and ‘deliberately misled’ over its product’s safety ‘as if selling horsemeat as beef’.

Most recently, contractors appeared more concerned about ‘cost and delay’ than fire safety, and on ‘appearance and cost’, while Exova consultant Cate Cooney had carried out a fire strategy report in 2012 on Grenfell in its original ‘state’ but ‘without visiting the site itself’, and included a ‘number of assumptions’.

After it was confirmed that the inquiry would begin hearing oral evidence again ‘on a limited attendance basis’, having been suspended in March due to the COVID-19 pandemic, the first week saw a senior fire engineer state they ‘did not raise the need for any proposed cladding system to have a separate fire safety assessment’, and another shared that he was sent the design report for the cladding, but did not view it as ‘he was not specifically asked to’.

Earlier this week, the two Exova consultants were said to have given ‘no thought’ to evacuating disabled residents because the law ‘didn’t require them to’. Yesterday, Dr Tony Pearson’s testimony included revelations that Studio E and Royal Borough of Kensington and Chelsea (RBKC) clashed over fire safety, specifically over firestopping ‘to prevent flames spreading between floors for at least two hours’. He also said that he had ‘hoped’ building regulators ‘would not notice’ that evacuation arrangements ‘might not be compliant’.

Inside Housing has now reported that on reviewing the refurbishment’s fire strategy he ‘had no clue that cladding was part of the plans’, and that as a senior consultant at Exova ‘at the time of reviewing the document’, he was ‘completely ignorant of the fact that the works included overcladding’.

In a summary of the refurbishment works, ‘there was no reference to cladding’, and the report has ‘come under scrutiny’ for a passage that read: ‘It is considered that the proposed changes will have no adverse effect on the building in relation to external fire spread but this will be confirmed by an analysis in a future issue of this report.’

There was also no consideration in a future fire strategy of the ‘possible safety impact’ of the cladding, and when asked whether he believed that the strategy should have been updated ‘in this respect’, Dr Pearson said ‘generally speaking, yes’. The last report undertaken by Exova ‘did not update’ the passage relating to external fire spread, and was reviewed by a ‘much more junior’ member of staff.

Dr Pearson was aware that cladding systems could pose fire risks as ‘an experienced fire engineer and an active on-call firefighter’, but ‘did not know’ that aluminium composite material panels ‘were being used as rainscreen facades’. Emails from October 2013 showed Dr Pearson was sent a copy of Exova’s second strategy, then sent it on to colleague and fellow witness Terry Ashton.

He stated in that communication that ‘I have added something (although if you think what I have added is too long and draws too much attention to the issue, feel free to shorten it)’. He had added a paragraph stating that the plans for ‘sharing means of escape between residential and non-residential accommodation is not endorsed by current statutory guidance’, but this did not breach building regulations as they were a ‘continuation of the existing principles’ for the tower.

In turn, fire risks from offices and a boxing gym in the tower were ‘no greater than those in a typical flat’, with Mr Ashton replying that he had sent the report out without reading this change, but ‘would not have agreed to the amendment anyway’ as it was ‘debateable’, despite Exova’s policy of peer reviewing all advice before sending it to clients.

Mr Ashton added that he hoped ‘Paul Hanson doesn’t pick up on it’, referring to the RBKC building control officer, as the department had a ‘reputation of being particularly hard to convince to accept anything non-standard’. Dr Pearson told the inquiry that Exova was ‘not trying to pull the wool on building control’s eyes’, and that his role was to provide ‘ad hoc assistance’ to Mr Ashton.

In 2015, an email from Dr Pearson to Mr Ashton stated that ‘if significant flames are ejected from the windows, this would lead to failure of the cladding system, with the external surface falling away and exposing the cavity, eliminating the potential for unseen fire spread’. Dr Pearson said this referred to a specific question about whether cavity barriers or stronger fire breaks were needed between compartments, and that he ‘still did not know which’ were being proposed.

He said this was ‘based on the assumption that everything else is code compliant’, and Inside Housing noted it ‘appears’ Mr Ashton had responded to Studio E’s Neil Crawford, who had asked the question ‘again, seemingly in breach’ of Exova’s peer review policies. Dr Pearson was asked if he had considered looking further into the cladding, and responded that this was ‘one of the big, great what-ifs’, and that he ‘took it on trust’ that Mr Ashton would know which materials would be used.