Restorative remediation: Global HSE Group outlines Injectaclad cavity barrier repair method

Global HSE Group examines Injectaclad, its installation process, applications and key benefits for restoring cavity fire barriers

A building with significant defects in its external wall fire safety systems present serious risks to both the structure and the people inside.

For example, a structure with missing or defective cavity barriers can experience rapid fire spread within wall cavities, causing devastating consequences for businesses, property owners and residents, while also posing a serious threat to critical infrastructure and occupant safety.

For the responsible stakeholders, amending buildings to become safe can be both costly and disruptive, with many projects requiring a full-scale removal of the external façade which often leads to disruption.

One solution available that enables non-intrusive works is Injectaclad, a remediation system for missing or defective cavity fire barriers to be retrospectively installed using a pumped system.

How it works

Injectaclad, for which Global HSE Group is a QA-approved installation contractor, is installed through small access openings created along the required compartment lines.

These can run vertically, horizontally, or around features such as windows and doors.

The openings are typically formed at approximately two-metre intervals horizontally and generally at floor levels for vertical installations.

At these locations, 4mm stainless steel InjectaPins are inserted into pre-drilled 6mm holes within the cavity.

A cylindrical acrylic mesh sleeve, known as InjectaMesh, is then positioned on the pins to establish and maintain the required compartment line.

Once the mesh and pins are in place, Injectaclad SS17 is pumped into the InjectaMesh.

The material expands to fill the cavity void, forming a continuous cavity barrier that reinstates the intended fire compartmentation within the external wall system.

The system, which can be used on a variety of buildings, including high-rise, commercial and residential, works by creating a fire-stopping barrier inside hidden wall cavities without removing the external façade.

By filling the cavity at specific compartment lines with a pumped, fire-resistant material, Injectaclad helps prevent the spread of fire and smoke through the building’s external wall system.

Once fitted, it has been tested to have a working life of 50 years, offers up to 120 minutes of fire resistance and is designed in accordance with fire safety regulations such as BS EN 1366-4 and BS 8414-1 &1366 part 4.

Visit www.globalpassivefire.co.uk/our-services/injectaclad-cavity-barrier/ for more information.

This was originally published in the April 2026 Edition of International Fire & Safety Journal. To read your FREE copy, click here.

Free CPD sessions from Injecta Fire Barrier on passive fire protection

UK-based CPD sessions cover cavity fire barrier compliance

Injecta Fire Barrier has announced it is offering free CPD sessions in the UK, focused on cavity and compartment fire barriers.

According to the company, the training sessions are aimed at contractors, surveyors, architects and fire engineers working on buildings affected by fire safety regulations.

The sessions focus on system-tested solutions that help meet compliance with the Fire Safety Act 2021 and Building Safety Act 2022, including the Injectaclad cavity fire barrier system.

Injecta Fire Barrier said the CPDs cover installation methods, compatibility with existing insulation, and documentation processes required for quality assurance.

The company said all sessions are delivered by passive fire protection professionals.

Injectaclad system avoids need to remove façades

Injecta Fire Barrier explained that the Injectaclad solution can be installed without removing the existing façade.

This allows for cavity barrier upgrades without invasive remediation work, reducing disruption and lowering material waste.

The company said the product works with a variety of insulation materials and irregular wall constructions, and supports both horizontal and vertical applications.

According to Injecta Fire Barrier, the process uses a graphite-based acrylic sealant injected into voids, reinforced with mesh and pins.

The material is classed as intumescent, meaning it expands when exposed to heat to help contain fire spread between compartments.

Fire-tested to British and ASFP standards

Injecta Fire Barrier said the Injectaclad system has been tested to BS EN 1366-4 for up to two hours of integrity and insulation.

The product has also been tested to BS 8414-1:2015+A1:2017, which assesses fire performance of external cladding systems.

According to the company, testing was carried out in accordance with ASFP Guidance TGD 19.

These test results support its use in remediation projects requiring documented regulatory compliance.

The company said installation records include image documentation and project references.

Product features support installation in occupied buildings

Injecta Fire Barrier said the product offers advantages for projects taking place in occupied residential buildings.

It is smoke, gas, water and air-tight, and does not require façade removal or relocation of residents during installation.

The company said the material is water soluble, odourless, and does not react with metallic or plastic building components.

It is also resistant to fungi and vermin, and has high expansion properties to ensure cavity sealing on contact with heat.

Injectaclad can be installed in cavity widths up to 200mm.

Managing Director says CPDs provide practical support

Shaun Tasker, Managing Director at Injecta Fire Barrier, said:
“Our CPD sessions are designed to provide practical insight into passive fire protection and compartmentation—enabling project teams to make informed, regulation-compliant decisions without invasive façade work.”

Injecta Fire Barrier said the sessions aim to help participants apply the information directly to current and future remediation projects.

Free CPD sessions from Injecta Fire Barrier on passive fire protection: Summary

Injecta Fire Barrier is offering free CPD sessions for UK construction professionals.

The training is focused on cavity and compartment fire barriers.

It supports compliance with the Fire Safety Act 2021 and Building Safety Act 2022.

The CPD includes guidance on the Injectaclad system, a graphite-based acrylic sealant.

Injectaclad does not require removal of façades and is compatible with PIR insulation.

The system has been tested to BS EN 1366-4 and BS 8414-1 standards.

It is suitable for horizontal and vertical applications, up to 200mm in width.

Injectaclad is water-soluble, odourless and resistant to fungi and vermin.

It expands on contact with heat to contain smoke and fire.

Installations are documented with images for assurance and audit purposes.

The CPD is designed for contractors, surveyors, architects and fire engineers.

Shaun Tasker, Managing Director, said the sessions are intended to support practical, regulation-compliant decisions.

Sealing spaces, saving structures: Using Injectaclad to remediate fire risk in hidden wall spaces

Injectaclad describes how its patented approach supports safer, faster building remediation

The question of fire safety in external walls continues to challenge housing providers, developers and regulators alike.

Cavity fire barriers, which play a key role in containing fire and smoke, have been found missing or poorly installed in thousands of buildings.

Traditional remediation has often required full façade removal – an expensive and disruptive process that many owners struggle to deliver at scale.

Injectaclad was created to address this issue in a more practical way.

Originating from a contractor’s request in 2016, the company has since developed and tested a method that restores fire-stopping performance with less disruption to buildings and their occupants.

Rather than focus on wholesale removal, the approach is aimed at reinstating compartmentation from the outside – preserving much of the original structure.

With increasing pressure on the industry to act proportionately, quickly and safely, Injectaclad’ s model is drawing attention.

In this conversation, the team behind the innovation explains how the system works, where it’s being used, and why a more scalable solution is needed now more than ever.

What specific fire safety issue does Injectaclad aim to resolve?

Injectaclad is designed to remediate missing and/or defective cavity fire barriers within existing buildings.

Following the Grenfell tragedy, regulations changed regarding how external façades are assessed in relation to compartmentation and preventing the spread of hidden fires.

We are increasingly finding that buildings are failing external wall surveys due either to cavity fire barriers being entirely absent or, where installed, being defective and unable to perform as originally intended.

How does Injectaclad installation differ from traditional remediation approaches?

Traditionally, where cavity fire barriers are missing or defective, large sections – or sometimes all – of the external façade must be removed to allow the installation of new passive fire barriers, followed by reconstruction of the façade.

Injectaclad enables remediation without removing the façade.

Instead, the system is pumped through small openings made in the external skin, forming a new cavity fire barrier.

These access points are repaired on completion.

A key difference is that Injectaclad has been designed, developed and tested to work with insulation left in place within the cavity.

It is an intumescent-based, high-expanding product.

In the event of a fire, as insulation burns away, Injectaclad intumesces, expands and seals the gap, preventing fire from spreading within the cavity.

There is no other system on the market that works in this way, and all testing – carried out at UKAS-accredited centres – is backed by third-party accreditation.

What are the main benefits of using Injectaclad in terms of cost, time and disruption?

There are numerous benefits to using Injectaclad for cavity fire barrier remediation in existing buildings.

In terms of time, installation is significantly faster than removing and rebuilding façades and insulation.

Disruption is also reduced, as the system does not require full façade removal.

Injectaclad can be installed via MEWPs [Mobile Elevated Working Platforms] rather than full scaffolding, so work may only take a few hours outside an apartment instead of residents living with scaffolding for months.

Environmentally, Injectaclad produces far less waste than traditional methods.

Because façades and insulation are not removed, there is minimal debris or material sent to landfill.

Cost savings are also achieved.

Shorter installation times reduce preliminaries, and avoiding full elevation rebuilds limits labour and material costs.

Where bricks are removed, they are generally reused.

Retaining existing insulation eliminates the expense of removal, disposal, and full replacement to maintain thermal performance.

If site conditions allow MEWP access, further savings are made by avoiding the need for scaffolding.

How does Injectaclad comply with PAS 9980 and fire risk assessments?

PAS 9980 is described as a “risk-proportionate guideline”, and the government has expressed strong support for ensuring that any remedial works required are proportionate to the risks identified.

Risk is rarely a matter of absolute safety or danger.

In most situations, it is not possible to reduce risk to zero, so the aim is to reduce it to a level that is reasonably acceptable.

Installing Injectaclad helps bring risk down to as low as reasonably practicable, in line with the ALARP principle.

This supports compliance with PAS 9980 and aligns with the expectations set out in current fire risk assessments.

Who installs Injectaclad and how is quality managed across projects?

Injectaclad is installed by our QA Approved Contractors.

After a vetting process, contractors are trained at our headquarters in Cardiff to ensure they fully understand the system.

We work with a small number of contractors deliberately, to maintain high standards across all installations.

In addition to training, we carry out site audits on live projects to verify that installations are being completed by trained operatives, in line with technical specifications and guidance.

Each project is documented as part of the Golden Thread, forming a live record passed from managing agent to managing agent or building owner to building owner.

All of our QA Approved Contractors are third-party accredited for passive fire protection and provide the end user with their own accreditation, alongside our product/system accreditation.

What types of projects has Injectaclad been used on so far?

Since 2020, Injectaclad has been used across the UK and Ireland on a wide range of buildings, from low-rise to high-rise, including everything from small remediations to multi-million-pound schemes.

Most projects involve multi-storey, multi-occupied residential buildings.

These include apartment blocks, student housing, Ministry of Defence buildings, modular homes, hospitals and care facilities.

Injectaclad is tested for use in timber-framed buildings, properties of traditional construction, and buildings with internal SFS structures, both with and without sheathing board.

To determine suitability for a specific project, we typically require a section drawing of the cavity build-up to compare against our third-party accredited EXAP [Extended Field of Application Assessment].

How has demand changed in recent months, particularly in light of the Public Accounts Committee report and the Gateway 2 backlog?

Most industry professionals agree that the Building Safety Regulator (BSR) represents progress toward safer living environments.

However, the BSR has acknowledged that it underestimated the volume of applications it would receive, resulting in a backlog.

This backlog has reduced demand for Injectaclad over the past year, as high-rise projects remain delayed in the Gateway 2 system.

Developers and building owners are keen to proceed, and in many cases, our QA Approved Installers already have contracts ready to begin once BSR approval is granted.

The BSR has indicated that its resourcing is improving, and the time from submission to decision is expected to shorten.

This will allow more remediation work to move forward, improving safety for residents and property stakeholders.

Meanwhile, demand remains strong for lower-risk buildings under 18 metres in height.

What future role could Injectaclad play in improving remediation outcomes?

We see Injectaclad continuing to play a central role in this effort, not only in the UK and Ireland but potentially worldwide.

The system is protected by a global patent, and our ability to deliver on its potential depends on two things: strong supporting test data and the quality of our QA Approved Installers – both of which we are committed to expanding and improving.

If you have a potential project where Injectaclad could be a suitable solution, please email enquiries@injectaclad.com.

This was originally published in the July 2025 Edition of International Fire & Safety Journal. To read your FREE copy, click here.