NFPA Conference & Expo returns to Las Vegas with 130 sessions and 420 exhibitors

NFPA conference details and event scope

The National Fire Protection Association (NFPA) will host its annual Conference & Expo at the Mandalay Bay Convention Center in Las Vegas on June 22-24, 2026.

NFPA confirmed the event will include more than 130 educational sessions covering issues in fire, electrical and life safety, including code compliance, emergency preparedness and building safety.

The event will bring together thousands of professionals from across the sector to attend sessions on global safety issues, fire protection systems, industrial hazards and electrical safety.

Exhibitors, theatres and technical meeting programme

The NFPA Expo will feature more than 420 exhibitors presenting products and services aimed at supporting compliance with codes and standards in building design, construction and operation.

Attendees will have access to three NFPA Specialty Theaters covering topics such as fire protection system inspections, artificial intelligence in facility management and wildfire preparedness.

The Responder Theater programme includes updates on the Firefighter Cancer Cohort Study, high-rise firefighting tactics, leadership accountability and survey findings from the Needs Assessment of the U.S. Fire Service.

The NFPA Products and Solutions Theater will present information on NFPA tools, resources and product offerings.

A three-day Spotlight on Public Education programme will focus on public health topics and community risk reduction.

The Spotlight on Latin America programme will deliver Spanish language sessions on current industry trends affecting the region.

Dan Chuparkoff will deliver the keynote at the opening general session, drawing on experience in technology leadership roles across multiple organisations.

The NFPA Technical Meeting is scheduled for June 25-26, allowing members and registered participants to vote on certified amending motions relating to NFPA Standards.

JEM Systems sets out plain steps for inspection readiness

JEM Systems guidance on fire alarm compliance

JEM Systems has published guidance for fire alarm installers on issues that can delay final inspections and on steps that can help projects meet fire and life safety code requirements.

The company said final inspection can still fail when installation work does not match the applicable fire code, even when a project has been completed on time and within budget.

Common causes of failed inspections include redline drawings or as-built records that do not reflect site conditions.

The guidance also points to equipment that is not UL listed or is installed outside approved specifications.

It adds that undocumented field modifications can cause delays when revised drawings have not been submitted for review.

Poor wire management, unclear device labelling and improper mounting were also identified as recurring inspection issues.

JEM Systems details installer responsibilities

JEM Systems stated that installers are responsible for following engineered drawings without deviation and for keeping redline documentation up to date through the project.

The guidance says devices should be clearly labelled and installation work should remain orderly.

It also says equipment used on site should match approved submittals.

Installers are advised to review the full submittal package before work begins and keep records accurate through the installation process.

The company also recommends avoiding undocumented field changes and raising any compliance questions with suppliers.

It said inspection expectations can vary between jurisdictions, making local Authority Having Jurisdiction requirements an important part of project planning.

JEM Systems said it works with installers during design, installation and inspection, including plan production, revisions for field changes, code-compliant equipment supply and direct coordination with Authorities Having Jurisdiction where needed.

The guidance presents code compliance as a shared task across designers, installers, suppliers and enforcement authorities during the course of a fire alarm project.