Allegion acquires UAP to expand UK fire and security offering

Allegion announces acquisition of Manchester-based UAP

Allegion has acquired UAP Group Limited, a Manchester-based fire and security hardware manufacturer, according to a company announcement.

The company said UAP will join Allegion International, strengthening its position in the UK non-residential sector.

UAP manufactures door hardware solutions, including patented and trademarked products, and will now operate as part of Allegion’s broader European operations.

The purchase price has not been disclosed. UAP CEO David Jennings will remain with the business during the transition period.

UAP product line and intellectual property portfolio

According to Allegion, UAP holds close to 200 patents, registered designs, and trademarks across its range of door hardware.

Its Armasmart range, which the company said eliminates 99.98% of viruses including COVID-19, was highlighted as a key example of its product development.

Allegion stated that UAP’s design-led approach and responsiveness to customer needs were aligned with its global strategy.

UAP has previously won the “Hardware Company of the Year” award in both 2023 and 2024 from the National Fenestration Awards.

It also received the 2024 Guild of Architectural Ironmongers’ Community Award for Company Innovation.

Company leadership and integration plans

UAP CEO David Jennings will remain involved in the business following the acquisition.

Allegion stated that Jennings will support the integration process and help drive growth across the combined UK operations.

Jennings said: “Bringing together UAP and Allegion adds great value for our joint distribution and customer base. We’re broadening our high-quality portfolios and creating meaningful opportunities to innovate together.”

Allegion explained that the transition will help accelerate its delivery of regional customer solutions.

The integration will take place under the Allegion International segment.

Allegion outlines strategic rationale

Allegion Senior Vice President and President of Allegion International, Tim Eckersley, said: “This is a natural extension of Allegion’s core mechanical portfolio with highly specifiable products that will leverage our existing solutions offerings and capabilities.”

He added: “Through our go-to-market alignment, complementary channels and sales expertise, we’ll fuel additional growth for both UAP and Allegion.”

Allegion stated that the move will increase its ability to serve UK customers with a wider range of mechanical and software-based fire and security products.

The company noted that combining portfolios would allow greater channel alignment across its mechanical and electronic solutions.

UAP will continue to serve customers in the UK from its base in Manchester.

Company background and UK operations

UAP was founded in 1996 and has operated as a manufacturer and supplier of door hardware from its Manchester headquarters.

The company’s UK operations will continue under the Allegion International banner.

Allegion said UAP’s customer-focused approach, regional manufacturing, and award-winning product lines made it an appropriate addition to its UK strategy.

According to Allegion, the acquisition also supports its ambition to expand across Europe with a stronger presence in the UK fire and security hardware market.

UAP’s distribution network serves customers across the UK construction and architectural sectors.

The acquisition is part of Allegion’s wider effort to integrate mechanical and digital access technologies across its markets.

Allegion acquires UAP to expand UK fire and security offering: Summary

Allegion has acquired Manchester-based door hardware company UAP.

UAP will become part of the Allegion International segment.

The acquisition is aimed at expanding Allegion’s presence in the UK market.

UAP holds nearly 200 patents, trademarks, and registered designs.

UAP’s Armasmart range eliminates 99.98% of viruses, including COVID-19.

UAP has won awards in 2023 and 2024 for product innovation.

CEO David Jennings will stay on to support the transition.

Allegion said the deal aligns with its mechanical and software strategy.

The acquisition strengthens Allegion’s non-residential UK offering.

UAP will continue operations from Manchester under the new ownership.

Is this helpful so far?

PlanRadar event highlights shift to digital construction

Industry event explores PlanRadar’s role in digital construction

PlanRadar recently hosted an industry event in Spain, bringing together stakeholders from engineering, construction, and legal sectors to discuss digital transformation, with participants including Arup, Eversheds Sutherland and construction firm Avintia.

The event focused on moving away from paper-based systems in favour of cloud-based tools that enable full traceability, risk reduction, and better data access.

It added that discussions centred on how platforms like PlanRadar support quality control, dispute avoidance, and the broader application of artificial intelligence in project delivery.

PlanRadar stated that the event marked part of its wider strategy to support digital adoption across the construction industry.

Arup outlines evaluation process for digital adoption

Arup joined the event as a customer of PlanRadar and shared its approach to selecting digital tools.

Sara Briz, Project Manager at Arup, said: “When evaluating tools, we aim for impartiality and seek out the best fit for our needs. In this case, that led us to PlanRadar.

“We chose PlanRadar for its ability to deliver process improvement, automation, and comprehensive data traceability.

“This aligns with our broader AI strategy, enabling our teams to focus on high-value creative and strategic work while maintaining complete digital documentation.”

Arup said its use of PlanRadar forms part of a wider initiative to increase automation and reduce manual reporting tasks on projects.

The firm added that comprehensive data capture was a key requirement during its evaluation of available systems.

Legal insights highlight value of digital documentation

Eversheds Sutherland was invited to contribute its legal perspective on the role of digital tools in construction.

According to PlanRadar, the firm addressed how documentation platforms can support legal processes and reduce the risk of disputes.

Andrés Ponce, Legal Director at Eversheds Sutherland, said: “The use of these types of tools significantly reduces the potential for disputes between stakeholders, creating a more collaborative environment and greater productivity in project development.”

He said digital documentation had become more important as AI tools are increasingly used in legal proceedings related to construction.

PlanRadar stated that the legal contribution helped demonstrate how its system supports audit trails and evidentiary standards.

PlanRadar says industry shift is underway

PlanRadar said the event captured a moment of change for the construction sector, as firms adapt to digital workflows.

Rob Norton, UK Director at PlanRadar, said: “Gathering perspectives from leading firms like Arup and Eversheds, alongside our valued customers like Avintia, at our recent event in Spain, highlights a pivotal moment in construction’s digital evolution.

“We are creating an environment that can deliver benefits including enhanced project quality, comprehensive traceability, significant risk reduction, and improved productivity across the construction value chain.”

PlanRadar said Avintia, one of its largest customers, has already introduced more than 10,000 subcontractors to the system.

It added that cloud-based platforms now offer real-time collaboration between teams, which was previously hindered by manual documentation.

PlanRadar plans further events focused on AI in construction

PlanRadar confirmed it will continue hosting events as part of its industry engagement strategy.

The company said upcoming discussions will place greater focus on artificial intelligence and how it is influencing project delivery models.

It added that digital platforms will play a key role in enabling AI-ready project environments by improving structured data access.

PlanRadar said it aims to support further collaboration between engineering, legal, and project management disciplines through these sessions.

According to the firm, future sessions will also feature customer case studies on the implementation of automated workflows and document audit systems.

PlanRadar event highlights shift to digital construction: Summary

PlanRadar hosted an industry event in Spain.

Participants included Arup, Eversheds Sutherland, and Avintia.

The event focused on digital transformation in construction.

PlanRadar said the shift away from paper systems was a key theme.

Arup shared its reasons for choosing PlanRadar.

Eversheds discussed the legal importance of digital records.

PlanRadar said the event reflects change in the construction sector.

Avintia has introduced over 10,000 subcontractors to PlanRadar.

PlanRadar said AI will be a focus of future events.

The company aims to support industry collaboration through digital tools.

Taylor Wimpey increases fire safety provision by £222 million following updated assessments

UK housebuilder expands cladding remediation work amid revised risk profile

Taylor Wimpey plc has increased its cladding fire safety provision by £222.2 million following updated fire risk assessments and site investigations across legacy buildings.

According to the company’s half-year 2025 results, the reassessment led to a higher estimate of costs associated with remediating cavity barrier defects behind brickwork and render, which had not been visible in earlier surveys.

The new provision includes £144.9 million for expanded remedial works, £39.5 million for additional cladding remediation, and £37.8 million for site-specific costs, professional fees and contingencies.

The company said it continues to support leaseholders by covering remediation costs and reiterated that residents should not bear the financial burden of these works.

Taylor Wimpey said the provision reflects its best current estimate, noting that it is pursuing cost recovery where applicable, including legal action where necessary.

Reassessment prompted by evolving guidance and expanded surveys

Taylor Wimpey explained that recent work to meet the Government’s Remediation Action Plan deadlines included further Fire Risk Appraisal of External Walls (FRAEW) and intrusive investigations.

The company stated that two-thirds of the additional provision relates to cavity barriers not identified during previous non-intrusive surveys.

It noted that some of the increase was linked to recent changes in how chartered fire engineers interpret the PAS 9980 standard, which has resulted in more conservative assessments of risk.

Buildings that previously required no remediation under older EWS1 assessments were now identified as needing work based on current FRAEW analysis, according to the company.

The firm said it had increased internal capability and accelerated its remediation programme to meet regulatory timelines and ensure safety standards are maintained.

Financial impact and group performance in first half of 2025

The company reported a loss before tax of £92.1 million in the first half of 2025, compared to a £99.7 million profit in the same period the previous year.

This result reflects exceptional charges, including the £222.2 million fire safety provision and an £18.0 million provision related to commitments made to the Competition and Markets Authority.

Group operating profit for the period was £161.0 million, including a £20.0 million charge related to defective workmanship by a former contractor on a London development.

Taylor Wimpey reaffirmed its guidance for full-year UK completions to be between 10,400 and 10,800 homes, with operating profit expected to be around £424 million.

The firm reported an 11% year-on-year increase in group completions, including joint ventures, rising to 5,264 homes in the first half of 2025.

Cladding remediation cost outlook and financial planning

Taylor Wimpey said it still expects cash outflow related to cladding remediation to be around £100 million in 2025, unchanged from earlier guidance.

While the revised provision increases the gross cost over a longer timeframe, the company stated that lower tax payments are likely to offset this in 2026.

The provision excludes any potential recoveries, although the company confirmed it is pursuing claims against responsible parties where applicable.

The company described the £222.2 million increase as its best estimate based on current assessments, noting that the provision is subject to change as further buildings are evaluated and remediation progresses.

Taylor Wimpey ended the period with a net cash balance of £326.6 million and anticipates a year-end balance of around £350 million, subject to land investment.

Ongoing remediation strategy and customer engagement

Taylor Wimpey said it prioritises completing works efficiently without compromising safety or quality.

The company said it remains committed to ensuring residents have a clear resolution pathway, and reiterated that leaseholders would not be asked to contribute financially to fire safety remediation.

Taylor Wimpey stated that its internal remediation delivery capability has been strengthened and that progress toward government completion targets is ongoing.

Chief Executive Jennie Daly said: “The safety of our customers remains our highest priority – this principle has consistently guided our approach.”

Daly added: “We have therefore increased our cladding fire safety provision to reflect findings from updated fire risk assessments and investigations in the first half.”

The firm confirmed it would continue to engage with relevant authorities, including the Building Safety Regulator, as well as industry professionals, to meet all legal and safety obligations.

Wimpey increases fire safety provision by £222 million following updated assessments: Summary

Taylor Wimpey plc has raised its fire safety provision by £222.2 million.

The company attributed the increase to expanded cavity barrier remediation works, new FRAEW assessments and evolving fire engineer interpretations.

Two-thirds of the increased provision relates to defects behind brickwork and render not visible in earlier inspections.

The updated figure includes £39.5 million for additional cladding-related work and £37.8 million in cost adjustments.

Fire safety remediation costs are not being passed to leaseholders, the company said.

Cash outflows in 2025 remain forecast at £100 million.

The company is pursuing cost recovery where responsible parties can be identified.

Net cash at the end of the first half was £326.6 million.

Operating profit for H1 2025 was £161.0 million, including a £20.0 million remediation charge unrelated to cladding.

Loss before tax was £92.1 million, also reflecting a £15.8 million CMA-related provision.

Taylor Wimpey reaffirmed full-year UK completion guidance of 10,400 to 10,800 homes.

UK Government appoints expert panel for building regulation review

Panel formed to review statutory building regulation guidance

The UK’s Ministry of Housing, Communities and Local Government has announced the appointment of six members to the Fundamental Review of Building Regulations Guidance panel.

The government said the panel will support its response to the Phase 2 recommendations from the Grenfell Tower Public Inquiry, specifically the need to review statutory guidance that supports compliance with Building Regulations.

The panel will provide expert input into the structure, production and presentation of the Approved Documents, which set out examples and explanations to support compliance with functional requirements.

According to the Ministry, the Building Safety Regulator was commissioned in December 2024 to lead the fundamental review.

The new panel will provide an interim update in early 2026 and a final report by summer 2026.

Building Safety Minister outlines goals of review

Minister for Building Safety Alex Norris said the panel was central to ensuring guidance remains clear and effective.

Norris said: “The appointment of this panel is an important step in our response to the Grenfell Tower Inquiry. Guidance which supports compliance with Building Regulations must be clear, accurate, and practical, and subject to regular updates to ensure it remains effective.

“The work of the panel will support our delivery of 1.5 million new homes, by making compliance easier, improving safety and quality in construction, and ensuring greater confidence in the building safety system.

“I look forward to receiving the panel’s recommendations.”

The Ministry confirmed that the panel will operate in an advisory capacity.

It added that further updates, including the Terms of Reference, will be published in due course.

Approved Documents under scrutiny after Grenfell

The Ministry stated that Building Regulations set the minimum legal standards for construction work in England and are supported by Approved Documents which give guidance on compliance.

Following concerns raised by the Grenfell Inquiry about the clarity and adequacy of this guidance, responsibility for reviewing and updating the documents was transferred to the Building Safety Regulator in April 2023.

This transfer was made in line with the Building Safety Act 2022, which mandates the Regulator to monitor safety and standards across the built environment.

The December 2024 commissioning of the fundamental review followed a call for urgent reform by the Inquiry.

The newly appointed panel has been established to inform the review process.

Backgrounds of appointed panel members

The panel includes six members with expertise across planning, architecture, digital standards, housebuilding and fire safety.

Dinah Bornat, architect and Director of ZCD, brings experience in people-centred development and urban design.

Dan Rossiter, Built Environment Sector Lead at the British Standards Institute, has worked extensively in technical documentation and digital information management.

Danielle Michalska-Morris, Director of Research and Technical Innovation at Taylor Wimpey, will contribute knowledge in low carbon design and building services.

Rachel Ferguson, Senior Development Manager at Pocket Living, has experience in affordable housing, planning policy and estate regeneration.

Professor Luke Bisby, Chair of Fire and Structures at the University of Edinburgh, was an expert witness in the Grenfell Inquiry and provides insight on structural fire safety.

Dr Hywel Davies, former Technical Director of CIBSE, previously chaired the Building Regulations Advisory Committee and brings broad technical experience.

Timelines and next steps for the review

According to the Ministry, the panel is expected to deliver an interim update in early 2026.

A final report is scheduled for publication in summer 2026.

The review is expected to influence how future guidance is written, structured and applied across sectors.

The panel’s work forms part of a wider effort to improve safety, clarity and accountability in the UK building regulation system.

Further announcements will include the panel’s full terms and working approach.

Government appoints expert panel for building regulation review: Summary

The UK government has appointed a six-member panel to support a review of guidance linked to Building Regulations.

The panel was formed in response to the Grenfell Tower Public Inquiry Phase 2 recommendations.

The Building Safety Regulator will lead the review.

The review focuses on how statutory guidance, known as Approved Documents, is produced and structured.

An interim update is expected in early 2026.

A final report is scheduled for summer 2026.

Minister Alex Norris said the panel supports efforts to build 1.5 million new homes.

Dinah Bornat, Dan Rossiter, Danielle Michalska-Morris, Rachel Ferguson, Professor Luke Bisby and Dr Hywel Davies were named to the panel.

The panel will serve in an advisory capacity.

New smoke control damper supports UK Building Safety Act compliance

TROX launches EKA2-EU damper for Building Safety Act compliance

TROX has introduced a new smoke control damper designed to support compliance with the UK’s Building Safety Act 2022.

According to TROX, the EKA2-EU is engineered for use in single and multi-compartment smoke extract ducts and air shafts, and has been launched following extensive testing.

The company said smoke control dampers are intended to remove smoke gases and provide supply air to fire compartments, with two safe positions – open or closed – depending on the location and direction of smoke movement.

TROX stated that the EKA2-EU meets the latest UK and European classification standards, and is suitable for both mechanical smoke extract systems and heating, ventilation or mixed systems where automatic activation is required.

It added that the product’s design is intended to assist customers in demonstrating system-level compliance with legislation in new and existing buildings across the UK.

Compliance standards and system integration

The manufacturer explained that the EKA2-EU complies with BS EN 12101-8 and is classified to BS EN 13501-4, offering classification levels of EI 90/120 (vedw,how i<->o) S 1000/1500 Cmod AA multi.

The damper includes a single blade for room separation and features a casing and damper tightness rating of at least 3C under BS EN 1751.

TROX said the product’s performance includes pressure levels ranging from -1000 to -1500 Pa and up to +500 Pa, depending on the application.

It stated that the smoke control damper includes a silicone-free design, no stop bars, and a large free cross-sectional area to support airflow requirements, even in fire conditions.

The company also noted that the EKA2-EU can be connected with TROXNETCOM and various control bus systems, supporting integration into building management and safety platforms.

Testing and certification in Europe

TROX confirmed that the EKA2-EU has undergone testing at its International Centre for Fire Protection Technology in Germany, with additional third-party accreditation by IBS in Linz, Austria.

The company explained that testing covered a wide range of installation types, including thermally insulated ducts, steel board systems, and various wall and floor constructions.

According to TROX, the damper has been certified across more than 400 individual installations, with compliance confirmed against BS EN 1366-10, 1366-2, and BS EN 13501-4.

It added that the EKA2-EU joins three other smoke control damper variants in the TROX portfolio, including the EK-JS, EK-JZ, and BVDAX models.

The company stated that these units are all tested to the harmonised BS EN 12101-8 product standard.

Technical features and performance specifications

TROX said the EKA2-EU is available in nominal sizes from 200 × 200 mm to 1250 × 1000 mm, with casing lengths of 305 or 500 mm.

It reported a volume flow rate range up to 12000 l/s or 45000 m³/h depending on velocity, and an operating temperature range of -20 to 50 °C.

The company stated that the differential pressure range is ±1500 Pa, and that upstream air velocity should not exceed 15 m/s.

TROX said the damper is suitable for restricting air volume flows where the throttle position is not changed during smoke extraction.

The manufacturer added that full product documentation is supplied to support correct installation and to help dutyholders and accountable persons demonstrate regulatory compliance.

Exhibition and public availability

TROX confirmed that the EKA2-EU will be exhibited at LondonBuild Expo on 19 and 20 November 2025.

The company said the product will be displayed at Stand N24.

TROX stated that the launch supports wider efforts to develop fire protection products aligned with building regulation changes in the UK.

According to the manufacturer, investment in testing and documentation aims to support those responsible for demonstrating safety under the Building Safety Act.

TROX added that the EKA2-EU is now available for specification and procurement across the UK market.

New smoke control damper supports UK Building Safety Act compliance: Summary

TROX has launched a new smoke control damper named EKA2-EU.

The product is designed for UK and European building safety compliance.

It is intended for use in smoke extract and HVAC systems.

The damper is classified to BS EN 13501-4 and BS EN 12101-8.

Pressure ratings range between -1500 Pa and +500 Pa.

The damper features a single-blade design with 3C casing tightness.

Testing took place at TROX’s facility in Germany and with IBS in Austria.

Over 400 installation types were tested for certification.

TROX supplies four damper models including the EKA2-EU.

Documentation is provided for installation and compliance support.

The product will be displayed at LondonBuild Expo 2025.

Fire stopping system deployed in Ark and FSi Promat collaboration

Fire stopping system installed on London construction site

Ark Fire Protection has reported a new on-site fire stopping collaboration with manufacturer FSi Promat, taking place at a live Hill construction project in Newnton Close, London.

The partnership involved the installation of the FlexiCoat System, which FSi Promat said offers up to 120 minutes of certified fire resistance through a combination of liquid-applied coatings and pre-coated sealing components.

Ark Fire Protection stated that both FlexiCoat products used in the installation hold the Code for Construction Product Information (CCPI) mark.

According to Ark Fire Protection, the project has been documented in a behind-the-scenes video due to be published via both companies’ online channels.

The company said the project demonstrates the practical application of certified passive fire protection methods in real construction environments.

Installation featured FlexiCoat System and CCPI compliance

FSi Promat explained that its FlexiCoat System includes two components designed for sealing penetrations and apertures.

According to the manufacturer, the system comprises a liquid-applied coating and a pre-coated solution known as “Flexi-Coat Fingers”, which together form part of its wider passive protection product portfolio.

The manufacturer added that both elements used in the Ark installation are certified for up to 120 minutes of fire resistance and have been assessed under the CCPI framework.

FSi Promat said the system is designed to remain flexible on site while meeting performance standards set out by UK regulations.

Charlie Perkins, Senior Technical Advisor at FSi Promat, said: “The FlexiCoat System is designed to meet the highest standards of performance and compliance, with built-in flexibility for a wide range of site conditions.

“Working alongside Ark Fire Protection, a team that shares our commitment to precision and integrity, ensures the system is installed exactly as intended – safely, effectively, and in full alignment with fire safety regulations.”

Ark Fire Protection outlines compliance approach

Ark Fire Protection stated that it takes a staged approach to passive fire protection, combining design collaboration with third-party certification and documented quality assurance.

According to the company, it is FIRAS-certified, UKAS-compliant, and ISO 9001:2015-accredited, with all fire stopping work subject to inspection and verification.

Howard Hudson, Managing Director of Ark Fire Protection, said: “At Ark Fire Protection, collaboration is at the core of everything we do.

“By working closely with trusted manufacturers like FSi Promat from the design stage onward, we ensure that every product specified is not just compliant – but precisely matched to the risks and layouts of individual buildings.”

Operations Director Joe Gale added: “We never cut corners.

“Every fire stopping detail is backed by training, manufacturer collaboration, and ongoing compliance audits.

“That’s what it means to deliver passive fire protection the Ark way.”

Joint project to be shared via digital video

Ark Fire Protection confirmed that the project with FSi Promat was documented via video during its execution on the London site.

According to the company, the video shows the process of installation, manufacturer collaboration, and on-site verification of passive fire products.

The film is due to be released via Ark Fire Protection’s and FSi Promat’s websites and LinkedIn platforms.

Ark said the video will serve as a record of best practice and a communication tool for both clients and the wider construction industry.

Hudson said: “Projects like this not only strengthen our partnerships – but also reinforce the trust our clients place in us to deliver safety, quality, and compliance at every stage.”

Companies aim to promote industry-wide compliance culture

Ark Fire Protection said that part of the motivation for documenting the project was to support broader sector goals around transparency, product traceability, and standards adherence.

FSi Promat is part of the wider Etex Group, which includes other UK construction product brands such as Siniat, Promat, Equitone, Remagin, Superglass and Ursa.

The company said that it continues to prioritise technical development and certified testing across its fire stopping product lines.

Ark Fire Protection stated that its work on the Hill site reflects a shared approach to specification-led collaboration, risk-aligned protection, and site-specific solutions.

Both companies said they will continue to focus on compliance, traceability, and knowledge sharing through joint projects and public communication.

Fire stopping system deployed in Ark and FSi Promat collaboration: Summary

Ark Fire Protection has collaborated with FSi Promat to install a fire stopping system at a Hill construction site in London.

The installation used FSi Promat’s FlexiCoat System, which includes a liquid coating and pre-coated components.

FSi Promat stated that the system offers up to 120 minutes of certified fire resistance.

Both products used are marked under the Code for Construction Product Information (CCPI).

Ark Fire Protection said the project aligns with its certified approach to quality assurance and regulatory compliance.

The company is FIRAS-certified, UKAS-compliant, and ISO 9001:2015-accredited.

Video footage of the installation is expected to be released by both companies.

Ark stated that the collaboration reflects its focus on risk-matched specification and product accountability.

FSi Promat is part of the Etex Group of UK construction product manufacturers.

The project was carried out at Newnton Close, London.

UK building safety research launched by BESA and Barbour ABI

MEP sector compliance under review in new building safety survey

The Building Engineering Services Association (BESA) has announced new research into how UK firms are responding to the current building safety regime.

The research is being carried out with construction analysts Barbour ABI.

BESA said the aim is to evaluate levels of compliance across the mechanical, electrical and plumbing (MEP) sector under the Building Safety Act.

The news follows changes announced by the UK Government, which removed enforcement responsibility from the Health and Safety Executive (HSE).

According to BESA, this is the second annual building safety survey targeting organisations of all sizes.

The organisation said it will assess levels of legal understanding, individual competence, and organisational capability across the MEP supply chain.

Fast-track measures follow planning delays and low approvals

BESA stated the research comes at a time of policy changes and growing urgency around planning approvals.

According to BESA, delays and a shortage of assessors prompted the Ministry of Housing, Communities and Local Government (MHCLG) to introduce a fast-track scheme.

The new scheme is being led by two former senior fire officers.

A Freedom of Information request submitted by cost consultant Cast revealed that only 10.8 percent of Gateway 2 project applications had been approved.

The association said these low figures had raised concern among industry bodies and highlighted the practical challenges of meeting planning regulations.

BESA also pointed to renewed public scrutiny following the release of the Netflix documentary Grenfell: Uncovered, which revisited the causes and consequences of the Grenfell Tower fire.

Survey aims to identify barriers to compliance

Rachel Davidson, BESA’s director of specialist knowledge, said the survey aims to uncover obstacles to legal compliance.

Davidson said: “We want to find out what is preventing organisations from adopting the requirements of the legislation.”

She added: “Levels of awareness and understanding of the Act have improved in the past 12 months, but it is a far from consistent picture.”

She continued: “We are seeing very big variations by role and type of organisation.”

She said: “Those with greater understanding, particularly of individual competence and organisational capability, are more likely to have taken steps to comply with the Act.”

BESA said the survey will explore role-specific awareness, track behavioural change, and examine why some organisations have not adapted their practices.

According to Davidson, lack of support remains a key issue: “Where action has not been taken, it is often due to a lack of clarity, guidance, or support.”

She added: “Identifying these barriers will inform targeted interventions to improve industry-wide compliance.”

Industry Competence Committee input included

BESA stated the new survey includes input from Jon Vanstone, chair of the Industry Competence Committee (ICC).

The ICC advises the Building Safety Regulator on matters relating to individual and organisational competence.

Vanstone said: “BESA’s research comes at an important time because pressure is building to get more projects through planning gateways.”

He added: “However, this also raises the stakes around competence and compliance because the industry will still need to meet rigorous safety standards as workloads increase.”

He continued: “Therefore, any findings that help us understand why companies might be struggling to meet the requirements will be incredibly helpful in shaping our advice to the regulator.”

BESA said the inclusion of ICC questions will help shape guidance and education efforts for the wider sector.

Legislative intent remains a central focus

The UK Government has pledged to hire 100 new planning specialists to reduce project delays.

According to BESA, this is linked to the Government’s goal of delivering 1.5 million homes during the current parliamentary term.

Alex Norris, Minister for Building Safety, said: “We’re enhancing operations, reducing delays, and unlocking the homes this country desperately needs – while keeping safety front and centre.”

BESA chief executive officer David Frise said the sector must remember the reason the legislation was created.

Frise said: “The Netflix documentary was a timely reminder to anyone involved in a building project that every decision they make has a consequence.”

He added: “If you are making a change to a design (possibly for very valid reasons) what impact will that have, ultimately, on the people who inhabit that building?”

Frise continued: “The research we are launching aims to understand why so many companies and individuals are still not changing their behaviour because, ultimately, this has to be about doing the right thing – even when no-one is looking.”

UK building safety research launched by BESA and Barbour ABI: Summary

The Building Engineering Services Association has launched new research on building safety compliance.

The study is being carried out with Barbour ABI.

It targets mechanical, electrical and plumbing sector firms across the UK.

It will assess awareness, behaviour, and legal understanding under the Building Safety Act.

The research follows the removal of enforcement powers from the HSE.

A new fast-track planning process has been introduced under the MHCLG.

Only 10.8 percent of Gateway 2 applications have been approved, according to Cast.

The study includes questions provided by the Industry Competence Committee.

The Government has pledged to hire 100 new specialists to speed up planning.

The research also responds to renewed public interest following the Grenfell documentary.

David Frise said the survey aims to identify why compliance remains inconsistent.

Rachel Davidson said understanding varies across roles and organisation types.

Architectural institutes form Belfast Group to align fire and life safety design

UK and Ireland form joint group for fire and life safety design

Architectural institutes from across the UK and Republic of Ireland have agreed to coordinate on standardised guidance for fire and life safety design.

According to the Royal Institute of British Architects (RIBA), the Belfast Group will develop aligned resources for architects operating across all five nations.

The coalition includes RIBA in England, the Royal Society of Architects in Wales (RSAW), the Royal Incorporation of Architects in Scotland (RIAS), the Royal Society of Ulster Architects (RSUA) in Northern Ireland, and the Royal Institute of the Architects of Ireland (RIAI).

The group has been formed in response to the Phase 2 report of the Grenfell Tower Inquiry, which raised concerns about inconsistencies and competence in building safety design.

The institutes said the new partnership will support aligned professional standards and help improve clarity around regulations, training and access to life safety information.

Coordinated response to Grenfell Tower Inquiry Phase 2 report

RIBA stated that the new group is one of several measures being taken by the architectural bodies in response to the inquiry’s findings.

The inquiry’s Phase 2 report identified systemic failings in the regulation and management of fire safety in the built environment.

In response, the five institutes said they aim to eliminate barriers created by regional differences in codes and competence standards.

The intention is to create consistent expectations and provide architects with access to all required technical data and statutory guidance, regardless of national boundary.

The initiative also aims to support client awareness by ensuring life safety is prioritised during the design brief and procurement stages.

Guidance development for wider construction sector

The institutes said that in addition to resources for architects, the group will create guidance applicable to other construction professionals.

This is intended to support informed decisions around procurement, risk management and design strategy for fire and life safety in projects of varying scale and typology.

The group said it will focus on making core fire design principles accessible to non-specialists to promote a shared understanding across the supply chain.

By doing so, they aim to create a framework for collaboration across disciplines, helping ensure design decisions are properly resourced and risks appropriately addressed.

The architectural bodies added that this guidance will not replace national codes, but support professionals in interpreting them effectively and consistently.

Joint statement from presidents of Belfast Group

The presidents of the five institutes issued a joint statement outlining the purpose of the new alliance and the shared priorities of the members.

Sean Mahon (RIAI), Karen Anderson (RIAS), Dan Benham (RSAW), John Lavery (RSUA), and Muyiwa Oki (RIBA) said: “The Grenfell Tower Inquiry Phase 2 report makes clear that more is required to ensure our buildings are as safe as possible.

“This is relevant for every architect. While each jurisdiction has its own regulatory framework, there are core competencies on designing for life safety that transcend political boundaries and project typologies.

“Therefore, the Belfast Group will share best practice, knowledge and information in design standards for life safety. This coordination will ensure that appropriate training and competency standards are implemented across each nation.

“We continue to work with our relevant governments to ensure that our members have access to all the regulations, standards and technical information they need whilst also providing guidance to clients on how to support the procurement and resourcing of projects, so life safety is at the heart of the appointment process.

“These steps will help deliver safer buildings for all.”

Support for regulatory access and training alignment

The Belfast Group said it intends to work with national governments to ensure full and open access to all relevant fire and life safety documentation for built environment professionals.

This includes statutory regulations, recognised technical standards and supporting guidance across the five nations.

According to RIBA, this approach is intended to reduce variability in access and interpretation of fire safety information by designers working across borders.

The group stated that it also plans to review training frameworks and recommend improvements in competency pathways, particularly for professionals taking on roles with life safety responsibility.

The institutes said they are committed to sharing best practice and adopting consistent baseline expectations for professional performance related to fire and life safety.

Architectural institutes form Belfast Group to align fire and life safety design: Summary

Architectural institutes from the UK and Republic of Ireland have formed the Belfast Group.

The initiative aims to standardise fire and life safety design guidance across five jurisdictions.

The group includes RIBA, RIAI, RIAS, RSAW and RSUA.

It was created in response to the Grenfell Tower Inquiry Phase 2 report.

The group intends to share best practice and align competence standards for architects.

It will also develop guidance for construction professionals beyond architecture.

The institutes will engage with governments to improve access to technical information.

They aim to help ensure that life safety is prioritised during design and procurement.

A joint statement from the five institute presidents confirmed these objectives.

The Belfast Group said it will focus on shared training and regulatory access.

She led the Grenfell inquiry – here’s what Dame Judith Hackitt says we’re still getting wrong

SFG20 interview highlights fire safety responsibilities in the UK

SFG20 has published an interview with Dame Judith Hackitt, who led the post-Grenfell review of UK building safety regulations.

The interview includes detailed comments from Dame Judith on fire safety, legal responsibility, building maintenance, and regulatory reform.

She said building owners remain accountable even when maintenance tasks are outsourced, and urged a shift toward competence, traceability and digital record-keeping under the principle of the “golden thread”.

The comments are focused on the UK regulatory context and reflect Dame Judith’s views on ongoing risk management obligations under the Building Safety Act and Fire Safety Order.

The full interview is available via SFG20, which described the exchange as an opportunity to support compliance, competence and improved industry practice.

Hackitt calls for competence and product assurance

Dame Judith Hackitt said that failings revealed in the Grenfell Tower Inquiry Phase Two report pointed to basic issues around staff qualifications, compliance gaps and falsified fire risk assessments.

She told SFG20 that these problems can be avoided by engaging only qualified people and verifying their credentials.

Dame Judith said: “For me, that’s where this all begins: making sure you’re using people who know what they’re doing, ask them to demonstrate and prove their competence.”

She added that responsibility also extended to the safety and testing of the construction products used.

Dame Judith said: “One of the significant gaps we still need to address, and which the government has committed to resolving in its response to the inquiry, is the issue of construction products and how they are tested. I believe this is critically important.”

She said there was a need for better assurance of the materials used in both maintenance and new construction.

Accreditation standards and organisational culture

Dame Judith said that professional bodies should do more to uphold standards, but added that employers also had a role in checking qualifications.

She told SFG20 that organisations must not rely solely on professional bodies to ensure competence.

Dame Judith said: “Organisations also need to take responsibility. They must recognise the importance of competence and avoid the mistake of employing anyone who claims to be a fire engineer without thoroughly verifying their qualifications and capabilities.”

She added that while CPD and accreditation are essential, their credibility depends on the quality of the oversight.

Dame Judith also said that the fire safety sector lacks the maturity seen in other engineering disciplines.

She said this must change if the industry is to develop the same level of rigour expected in areas such as structural engineering.

Legal responsibility and penalties for non-compliance

Dame Judith said that current regulatory reforms are not about new duties, but about ensuring people meet responsibilities they already had.

She gave the example of two directors who were fined over £100,000 for breaches in fire protection at care homes.

Dame Judith said: “We’re treating this as if new responsibilities have suddenly been placed on them, when in fact we should be focusing on their appallingly cynical attitude towards the people they had a moral duty of care for all along, long before any new regulations came into effect.”

She stressed that legal accountability cannot be outsourced, even if the work is.

Dame Judith said: “If you’re the owner, you are responsible and accountable. You can delegate the work, but you can never delegate the accountability.”

She added that as penalties increase and cases reach court, judges are likely to take a strict view of building safety failings.

Responsibilities under Fire Safety Order and building regulations

Dame Judith addressed the specific case of buildings that fall outside the scope of the Building Safety Act’s occupation phase.

She said that facilities such as hospitals, though excluded from some parts of the Act, must still be treated as high-risk buildings with enhanced safety expectations.

Dame Judith said: “The higher the risk in a building, the greater the effort required to understand the safety case for that building and its occupants.”

She said this principle is assumed to apply universally, regardless of formal scope.

Dame Judith also challenged any perception that regulatory exclusion lowers the need for rigorous maintenance and oversight.

She emphasised the need for owners and managers to ask whether a building has the systems in place to ensure evacuation and fire control.

Digital record-keeping and golden thread implementation

Dame Judith advocated for the adoption of the “golden thread” principle in building management.

She told SFG20 that digital records must include how a building was designed and built, the fire strategy in place, and the performance limits of all systems.

Dame Judith said: “I just find it remarkable that this information often doesn’t exist. In any other sector… they can trace everything. They know the limitations of their products, how things perform, and what they’re capable of.”

She added that paper-based systems were no longer acceptable.

Dame Judith said: “If we’re going to do that in the 21st century, for goodness’ sake, let’s not do it on paper. Let’s do it digitally.”

She also said that maintaining accurate, traceable, and accessible digital information must become a routine part of managing building safety.

Future regulatory changes and systemic improvements

Dame Judith discussed the government’s intention to introduce further regulations.

She said this will likely include measures to ensure the suitability and traceability of construction products.

Dame Judith said: “Fixing that system is no small task. It will require a significant amount of work, as well as a shift in behaviour from a wide range of people, particularly those who supply construction products.”

She warned against longstanding practices that prioritise cost over safety, citing staircase design as one example.

Dame Judith said that single-staircase high-rises had been accepted for too long and welcomed their removal from new building designs.

She said that overall, fire safety should be approached as a system-level challenge rather than a checklist of individual measures.

She added: “You’re the expert, make those decisions, issue your recommendations, and stand by them.”

Building safety must adopt digital golden thread, says Dame Judith Hackitt: Summary

In an interview with SFG20, Dame Judith said building owners must take full responsibility for fire safety compliance.

She warned that outsourcing maintenance does not remove legal accountability.

She said competence must be verified and upheld by both professional bodies and employers.

Dame Judith said the fire safety sector lacks the maturity of structural engineering.

She called for stricter assurance of construction products and testing systems.

She said new penalties will be harsher and judges may take stronger positions in future cases.

Dame Judith said that even buildings excluded from current regulations should apply risk-based safety principles.

She said the “golden thread” approach must be adopted, with digital building data records.

She said new rules will target product testing, specification practices and risk mitigation.

She said fire safety should be approached as a system, not as a list of isolated measures.

Diriyah Company awards SAR 5.75 billion construction contract for Arena Block

Construction contract covers arena, offices and parking

Diriyah Company has announced the award of a SAR 5.75 billion ($1.53 billion) construction contract to Branch of China Harbour Engineering Company Ltd for the Arena Block development in Saudi Arabia.

According to Diriyah Company, the contract includes construction of the Diriyah Arena, three mixed-use office buildings and associated parking infrastructure.

The Diriyah Arena will have a gross floor area of around 74,000 square metres and seat up to 20,000 spectators.

The venue is intended to host concerts, sports events, esports, exhibitions and live performances.

The project is part of the broader Diriyah development supported by the Public Investment Fund.

Arena designed to combine modern infrastructure with heritage architecture

Diriyah Arena has been designed by HKS Inc. to reflect both the geology of the area and Najdi architectural elements.

Diriyah Company said the architectural style aligns with wider efforts across the project to integrate cultural identity into new infrastructure.

The venue is intended to support community use and international events.

It will be one of several entertainment and cultural destinations in the wider Diriyah development.

Other venues in the project include the Royal Diriyah Opera House and a network of museums and academies.

Mixed-use offices and transport access also included

The Arena Block will also feature three mixed-use office plots designed by John McAslan + Partners.

These buildings will total around 114,000 square metres.

The contract includes a car park with capacity for more than 4,000 vehicles.

The parking is intended to support both arena events and office operations.

Diriyah Company said the development will be supported by advanced digital infrastructure.

Project supports long-term goals of Vision 2030

The Arena Block forms part of the 14-square-kilometre Diriyah development.

Diriyah Company said the area is expected to house around 100,000 people and generate 178,000 jobs.

The development is projected to bring approximately 50 million visits annually.

The company expects the project to contribute about SAR 70 billion ($18.6 billion) to the national GDP.

Jerry Inzerillo, Group CEO of Diriyah Company, said: “The iconic Diriyah Arena will be a landmark entertainment complex in Diriyah that reinforces the City of Earth’s growing global role in shaping Saudi Arabia’s artistic and cultural future, in alignment with Vision 2030.

“By attracting both residents and global visitors to experience world-class sports and performances, the Diriyah Arena firmly demonstrates our commitment to creating a world-leading gathering place.

“It also highlights the rapid progress we are making in developing a diverse range of assets across the Diriyah project.”

Contractor outlines delivery expectations

China Harbour Engineering Company Ltd is the contractor responsible for the works.

The company’s regional CEO welcomed the award of the contract.

Yang Zhiyuan, CEO of China Harbour Engineering Company Ltd (Middle East), said: “This award marks a significant milestone for CHEC in the Kingdom of Saudi Arabia.

“CHEC will bring to the project a wealth of global experience, technical expertise, and a proven track record in delivering the complex.

“We will mobilize the best resources and talents from across our international network and strive for excellence to ensure the successful and timely delivery of this world-class Arena.

“We will continue commitment to keep delivering excellence in support of Vision 2030.

“We are deeply proud to be part of it.”

In December 2024, the same contractor was awarded SAR 758.5 million ($202.2 million) for bulk excavation work in the Diriyah project.

Diriyah Company awards SAR 5.75 billion construction contract for Arena Block: Summary

Diriyah Company has awarded a SAR 5.75 billion construction contract to Branch of China Harbour Engineering Company Ltd.

The contract includes the Diriyah Arena, three office buildings and a parking facility.

Diriyah Arena will have a gross floor area of 74,000 square metres.

The venue will seat up to 20,000 people and host a range of events.

The arena design was developed by HKS Inc.

Three office plots covering 114,000 square metres are included.

The Arena Block will have over 4,000 parking spaces.

Architects John McAslan + Partners designed the office buildings.

The Diriyah project is backed by Saudi Arabia’s Public Investment Fund.

Diriyah is expected to generate 178,000 jobs and host 50 million visits per year.

The broader development will contribute around SAR 70 billion to the national GDP.

CHEC previously received a SAR 758.5 million contract for excavation work.

Construction supports the targets of Vision 2030.

Diriyah Arena will join other cultural venues in the area.